Thursday, December 23, 2010
Thurs Dec 23 Apache Trail
I am trying to sell my DR650 on Craigslist and agreed to meet an interested party in Tortilla Flats, AZ. That was all it took to make me decide to ride the Apache Trail today. It is 65 miles from my house to the beginning of the Apache Trail, so how do you think I felt when I was greeted by this sign?
Friday, December 10, 2010
If you read the sign, you know that this bridge was built in 1989 to replace the old one. The old one was built with wood standards that were later reinforced with concrete when they began to weaken. Notice the curved cable to the right of the bridge. It is use to keep the bridge from swaying sideways.
7 Springs, SheepBridge, Lower Bloody Basin Trails
Friday, Dec 10, 2010,
Bronson and I met at 8:00 AM today to ride the Bloody Basin Trail. Leaving the Carefree, Cave Creek area, we took the Seven Springs trail off of the Bartlett Lake Hwy. At the start, the trail was very easy, and the scenery was not really too exciting. Once we neared the Seven Springs campground area, things started looking up.
Friday, December 3, 2010
The CAP (central az project) canal is used for irrigation of our farms. This water is pumped fro the Colorado river into the Lake Plesant reservoir during the winter and released to the farms during the summer.
I can tell I getting closer to home as I'm seeing signs of civilization. My next ride will be the Bloody Basin trail on Friday the 10th of Dec.
The new mounting system for my top box worked great, but it is obvious the the things inside get a rough ride. That was a full bag of almonds with only a small opening at the top about 1" long. It is now almost empty and all those almonds are somewhere in the bottom. That red lid was on tight when I started out.
Subscribe to:
Posts (Atom)